Altcoins
IOST passes the activation threshold for its v4.10.0 upgrade
The IOST network has passed block 480,080,000, the threshold set by the project for new execution rules. Its public endpoint reports the block as irreversible, with a timestamp corresponding to November 11 at 12:18 a.m. Paris time.

A specific block triggers the rule change
IOST's public service reports that block 480,080,000 was produced on November 10 at 23:18:24 UTC and classifies it as irreversible. During the network check, the head height was 480,085,630 and the latest irreversible height was 480,085,567. These figures place the chain beyond the threshold specified in the version 4.10.0 announcement. They establish when the threshold was crossed without establishing that every connected service has completed its own adjustments.
The official announcement estimated that the threshold would be reached on November 10 at approximately 23:45 UTC. It said that the estimate could change with block production speed. Activation depended on block height rather than the announced time. The observed block therefore preceded the estimate by about 27 minutes. In mainland France, its timestamp falls on November 11. That date difference reflects the one-hour offset between Paris and UTC at this time of year.
Contracts and error handling are affected
IOST describes version 4.10.0 as a mandatory upgrade incompatible with the previous rules. Its announcement outlines improvements to error handling for contract calls, isolation within the virtual machine, and validation of storage parameters. These changes concern the environment in which contracts execute. Crossing the threshold does not by itself measure the effect of each change on applications already deployed.
The project also lists handling of insufficient Gas budgets, contract deployment, and contract upgrades among the areas changed to improve node stability. Gas represents the resource budget allocated to executing an operation. The announcement provides no comparison of error rates or performance before and after activation. The height data consulted confirm that the chain continued producing blocks beyond the threshold.
Software versions require a separate check
The project's published resources list a container image called iostio/iost-node:4.10.0. The announcement asks block producers, exchanges, custodians, and other full-node operators to install compatible software before the threshold. It warns that delays can affect block production, synchronization, or transaction confirmation. These warnings are directed at operators running the network's software.
To check an installation, the project says to verify the code version and commit hash. It also recommends preserving configurations and data volumes during manual upgrades or rebuilds. The version number in a block header does not provide an inventory of the software operators use. The public observations establish that the threshold was crossed and the chain subsequently advanced, while checking individual installations remains each operator's responsibility.
